Trackwork Engineering

Taiwan High Speed Rail T210/T220  Trackwork Project

Taiwan High Speed Rail T210/T220 Trackwork Project

Taiwan High Speed Rail T210/T220  Trackwork Project

Client: BARCLAY MOWLEMS (TTPR JV)

Location: Taiwan Taoyuan ~ Taichung

Completion Time: 2005.07

Type of Work: 42.2 km Non-Ballast Track Rheda 2000 System at 4 Stations (Taoyuan, Hsinchu Miaoli Station and Taichung).
                          Including: 1. Viaduct Section 2. Tunnel Section 3. Embankment Section 4. Steel Bridge Section 5. Crossover

 

Previous Page   |   Back   |   Next Page