Client: Dragon Steel
Location: Taiwan Taichung
Completion Time:
Type of Work: Raw material stacking field, reclaimer and stacker loading on upper track (1600M) and lower tracks (1600M)
Previous Page | Back | Next Page
Taiwan Railway Chenggong Zhuifen double-track project (section of civil engineering - north-south line)
C611 Chiayi Plan Railway Viaduct and Road Under The Bridge Project
Taipei MRT Xinlu line Xinzhuang Depot Trackwork Project
China Steel Corporation SCR Track Construction