Client: Dragon Steel
Location: Taiwan Taichung
Completion Time:
Type of Work: Raw material stacking field, reclaimer and stacker loading on upper track (1600M) and lower tracks (1600M)
Previous Page | Back | Next Page
Yongchun Apartment complex Regeneration Project
The Depot relocated from Kaohsiung to Chaozhou and the Development Plan of the Original Site
China Steel Corporation SCR Track Construction
Taipei MRT Xinlu line Xinzhuang Depot Trackwork Project